Working with the St. Louis MetroLink, Altech was responsible for removing flooring of LRVs, repairing structure, and installing new flooring for Siemens-manufactured railcars.
St. Louis LRV Field Service: Removed flooring of LRVs, repaired structure, installed new flooring for Siemens manufactured railcars.
Location: St. Louis, Missouri
Project Timeline: Feb 1998 – 2000