ALTECH provides ongoing subcontractor staffing with key benefits and work procedures to allow for total control of the production team. Scope of work includes providing a continuous 225 qualified and vetted workers for the entire program cycle.
LRV, QC, and Final Acceptance
San Diego Transit: Altech provided technicians to handle modifications for entire fleet. Project involved critical path management regarding production float and final acceptance. Location: San Diego,CA Term: June 1997 – 1998
Our work on the Metro has continued to evolve and includes:
Vendor surveillance (field audits of sub-components in USA, Canada, & Mexico)
Incoming inspection (as the material is delivered to the manufacturing plant)
Production supervisors and assemblers with mechanical, electrical, testing, and other specialized skills
Sub-assembly of trucks and interior components services
QC supervisors, function testers, and inspectors
Field final acceptance and commissioning
Administrative support and direct placement services
Administrative support and direct placement services
Exceeded
As our ongoing project continues with the LA Metro Transit Authority, these benchmarks have been met or exceeded.